Supported by a grant from Iceland, Liechtenstein and Norway through the EEA Grants 2014-2021, in the frame of the Energy Programme in Romania
Project title: Production of electricity for own consumption, by capitalizing on renewable energy resources
Project total value: EUR 327.998
Project Romania energy Norway grant: EUR 278 798
Project implementation period: June 2022 – December 2023
INCD ECOIND, with the financial assistance received through the project, intends to adopt new technologies for energy storage, improve energy efficiency and increase decentralized generation which translates to increase the share of clean energy to be installed. The project results and outcomes benefit the environment by reducing greenhouse gas emissions and by increasing the use of renewable energy.
The investment objective is to build a photovoltaic installation with an installed capacity of 220 kW, using solar energy as a renewable source.
Expected outcomes and outputs:
- Estimated annual CO2 emission reductions: 112 tonnes of CO2 eq./year;
- Energy produced from other renewable sources in MWh/Year: 305 MWh/year;
- Estimated number of jobs created: 1
- Installed capacity for production of electricity from photovoltaic panels: 0.22 MW;
- Number of new installations for production of renewable energy: 1;
- Number of staff trained in the project: 3.
Project news
– Press announcement for the launch of the project
– Interview conducted within the project
– Press announcement for the completion of the project
– Video with the location at the completion of the project
Detailed information about the financing programme:
Additional information about the project:
Luoana Florentina PASCU – Project Manager
Tel. +4.021 410.03.77; +4.021 410.67.16
E-mail: ecoind@incdecoind.ro